Taunton Third Way bridge lift preparation

Posted on 24. Apr, 2015 by in Cranes

VN:F [1.9.22_1171]
Rating: 0.0/5 (0 votes cast)

Taunton Third Way bridge lift preparation. 23 March 2011.

. This is for the new bridge over the River Tone.

The Sarens crane apparently costs 27,000 UK pounds per day

 

รถตักดิน Liebherr Excavator
bini gru Fassi F1100RA.28 Scania.mpg

Comments are closed.

Read previous post:
bini gru Fassi F1100RA.28 Scania.mpg
ALPINE ROADHEADER TUNNELING MACHINE
Watch The sensitive touch of beer loving Excavator That Goes Viral
Close